Each approach, every single part, each and every function in EPG is demanded to be carried out one particular action adhering to an additional, meticulously and cautiously, from content assortment, reformation to production add-ons, from factors heat therapy to computerized assembly, from high quality handle to item inspection and tests and from get working to after sales provider. Provider & Good quality controlWe provide thorough drawings and offer you anytime necessary. The team has taken component in the making and revising of ISO/TC100 international chain common numerous several years in accomplishment and hosted the sixteenth ISO/TC100 Intercontinental once-a-year conference in 2004. Why EPT?
- Strictly analyzed according to IEC60034-two-one testing approaches.
- FleXiHu (West EPT) Dis.bility in non-stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd motors.
- Lowertotal operational EPT for users
- Optimized cooling method to make sure the minimal temperature increase.
- Built-in in-residence source EPT to management the EPTT cycle of manufacture
EPTnical characters:
Frame measurement: eighty-a hundred
EPTT selection: .75-three.0KW Pace: 3000-1500 RPM
IP55, Course F insulation, Course B temp.rise, S1 duty
Voltage 220V
Ambient temperature: – 20 degC ~ 40 degC
Altitude lt1000M
Software:
EPTs Jans, pumps, conveyors, exhausters, EPT automobiles.textile sector EPTTs, compressors, and other purposes where velocity variation, substantial effectiveness, reduced sounds and reduced volume are mXiHu (West EPT) Dis.Hu (West EPT) Dis.tory.