Due to our sincerity in giving very best services to our consumers, comprehending of your needs and overriding perception of accountability toward filling purchasing requirements, EPG was awarded with “famous solution of Zhejiang Province” and “well-known manufacturer of Zhejiang Province”. Obtaining accrued valuable expertise in cooperating with overseas buyers,
JK-DR400 Metal Crawler Portable Drinking water Effectively Drilling Rig
Model amp Name | JK-DR400 |
WeigEPTT | 10 Ton |
Proportions(mm) | 5900*2100*2850mm |
EPTT Oil | EPTT |
Motor Product | YUCHAI |
Rated EPTT | 92 kW |
Travelling System | Metal Crawler |
Drilling depth | 400m |
Bore diameter | one hundred forty-350mm |
Drive Head Stroke | 6.6m |
Travelling speed | two.5km/h |
Gradeability | 30% |
Rated pressure | one.seven-three.five MPa |
Air use | 17-35 m sup3/min |
Drill rod diameter | Phi89 / Phi102 / Phi108 mm |
Drill rod length | one.5m, 2.0m, three.0m, 6.0m |
Elevating capacity | twenty five Ton |
Swing velocity | 45-115rpm |
Swing torque | 6500-9000 N.m |
1. The engine uses YUCHAI 92 KW turbocharged engine
two. Walking Type: crawler mounted ,trailer mounted for selection.
3. EPTT oil pump:PXiHu (West Lake) Dis.Hu (West Lake) Dis.lel EPTT style separates the oil pump device, the EPTT provide is adequately dispersed, the EPTT program is EPTTly made, and the upkeep EPTT is little
four.Rotary head gadget:EPTT built-in casting, twin motor EPTT, large torque, tough, lower upkeep EPTTs
5.Drilling EPTT chassis:skilled digging chassis, sturdy, weighty bearing, extensive EPTT plate, considerably less harm to challenging roadways
6.EPTT pressure:layout composite tower, six.6m EPTT stroke, double cylinEPTTlift ability 25 ton.
seven. Every rig is equipped with a reduction valve to increase the growth to protect the cylinEPTTand make certain operate security
eight. Each EPTT oil pipe is lined with a protective jacket to make the oil pipe last EPTTer.